last report October 6, 2023
I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.
I have a finish, and, I can see the end for some of the quilts on my list. I am excited to look at something new
1. uneven 9 patch - is finished -
2. strip tease pattern- all the pieces are in twosies - I am sewing these into blocks of 3.
3. spoolin around leader ender challenge 2013 - The spools top is finished, and, ready for a back and quilting.
4. min churndash - I love making these and have kept to my goal of one every day. I may go to the end of the year.
5. shirt anvil - It hasn't been that long since it went to the UFO closet. I used a random number generator to pick, and, this was the lucky number. welcome back. I liked making these. They look so great in shirt fabrics.
new #1 sweet pea - I decided on an on point setting. I have started with the sashings
MY next on the longarm of my own quilts in the 'to be quilted' closet.
1. fair and square- october one monthly goal- back, binding prepared, on the frame, quilted
spools
customer quilt
2. old world mystery - twins
3. full stop punctuation
4. cheddar jubilee
5. crayon
crab apple hill snow days
I am linking: