Showing posts with label uneven 9 patch. Show all posts
Showing posts with label uneven 9 patch. Show all posts

Sunday, October 29, 2023

stash report October 29, 2023

I bought this cute neutral print at the thrift store. I like fabric with print and words.


 stash report October 29, 2023

fabric added: 1 yards 

fabric added year to date: 139 1/4 yards 


fabric used:  25 yards - Fair and square finished 25 yards

25 yards

fabric used year to date: 473 yards 

304.75  yards used more than bought

I sewed 7 days last week. 

I have packed up my rug and my hexie quilt, and, put them into storage until after my daughter's visit for Thanks giving. I am trying to do a big clean up of the living room. I am not sure what  stitching I can do in the meantime. I did hook the moon in the center of the rug, before I put it away.

I bought a template that I might try hand piecing the old block block. I can't think of the name. I can use it on 2 1/2 inch strips.


I am linking to:


Sunday, October 22, 2023

stash report October 22, 2023

These 2 pieces of fabric were on the free table as part of someone's Christmas fabric destash. I just saw them as neutrals that could be in any scrappy quilt, and added them to my stash.


 stash report October 22, 2023

fabric added: 4.75 yards 

fabric added year to date: 138 1/4 yards 


fabric used:  0 yards 

fabric used year to date: 418 yards 

276.75  yards used more than bought

I sewed 4 days last week. 

I pulled my Christmas rug out, again, and, began working on the background around the reindeer. I am

adding the background  a little at a time.


I am linking to:

Sunday, October 15, 2023

stash report october 15, 2023

A friend gifted me some 1 1/2 inch squares, after I saw quilting buddy Lucy was making a postage stamp block. This jar was jam packed and nearly spilled over when I opened it. But, I just had to try Lucy's block. I was inspired.


stash report October 15, 2023

fabric added: 0 yards 

fabric added year to date: 136 1/2 yards 


fabric used:  1 +12yards -uneven nine patch is finished

66 x80



fabric used year to date: 418 yards 

281 1/2 yards used more than bought

I sewed 4 days last week. 

I pulled my Christmas rug out, again, and, began working on the background around the reindeer.

3/ 24

I am linking to:

Friday, October 6, 2023

5 quilts October 6, 2023

last report September 18, 2023

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another. 

There has been some rotation of projects as I have finally finished a few. I look forward to new Ufos that have come out to play with me.

1. 1. wensleydale a jen kingwell pattern - is finished


2. uneven 9 patch - is finished - the weather has not cooperated for a photo, yet.


3. strip tease pattern- all the pieces are ready for assembly


4.spoolin around leader ender challenge 2013 - The spools center is finished and ready for borders


new 5. min churndash




new #1 shirt anvil - It hasn't been that long since it went to the UFO closet. I used a random number generator to pick and this was the lucky number.


MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

1. fair and square- october one monthly goal- back, binding prepared

2. old world mystery - twins

3. full stop punctuation

4. cheddar jubilee

5. crayon

crab apple hill snow days

I am linking to:

TGIFF different   

please consider signing up to host the weekly party here 


Monday, September 18, 2023

5 quilts September 18, 2023

 last report August 14, 2023

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another. 

I have finishes that are exciting, and, I have a few more getting ready. Working on 5 quilts at a time, isn't fast, but, overtime, I chip away at these worthy projects.

1. wensleydale a jen kingwell pattern - I am working on assembly and piecing the top. Finishing it is my one monthly goal for September at elm street quilts.



2.  plaid kaliedescope - I have all the pieces cut for the blocks, I think I will return it to the UFO closet

3. uneven 9 patch - The center is finished and I am adding borders

I will add an inner border and an outer border

4. rectangle wrangle quilt.- finished



5. spoolin around leader ender challenge 2013 - I practically restitched all the blocks and have started assembly with setting triangles.


new # 2. strip tease is a scrappy quilt with flying geese and 4 patches. I have a drawer full of 4 patches

from the internet

new # 4 is an older ufo ( aren't they all older) from 2015

equal rights -I have the pattern and a fabric pull in the box.  I looked at it for a week, and decided I wasn't going to finish it. all done.

MY  next on the longarm of my own quilts in the 'to be quilted' closet. I have been interrupting this list when I complete a ufo and slide it onto the longarm for a complete finish.

1. hand me down - back made, on the frame, quilted, finished


2. triple irish chain - found, back,  on the frame, quilted, finished



 Lucille star flimsy -find, can't find -what did I do with it? some place safe I am sure

1. fair and square - bonnie hunter quilt pattern

new # 2 old world mystery - twins

new #3 full stop punctuation older rsc project

new # 4 crayon older rsc project

new #5 cheddar jubilee - bonnie hunter quilt pattern

I am linking:


Monday, December 12, 2022

5 quilts December 12, 2022

 last report 5 quilts November 16 , 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.

1. rhododendren mystery - Bonnie hunter - 

finished 12/22

2. Boho heart - it is quilted waiting on binding

3. dotty bow ties-  all the blocks are done and first sashing on them

4. circa 1880-  More about this here.  no progress

5 - frolic mystery - back and binding - re-ironed - frame  finished  11/22

Making a 5 quilts report has been good for staying on track and finishing, but, I am bored with how long it takes to finish, and, I can't find stuff and keep it straight anymore.  I have a few concerns.

maybe one at a time would be better? but would I get any others done?

I decided to keep the list, but, work on one at a time.

Rhododendron was my first experiment. I finished it in 8 days including quilting. That was great and helped with motivation. And as long as I had a list item per day. I wasn't bored. 

take Rhododendron  16 steps -I finished Rhododendron in 8 days which is impressive for me sticking to the plan

day 1: friday

cut inner border done

sew inner border done

day 2: saturday

make odd border pieces done

piece border done

day 3:sunday

attach border done

iron done

back done

prepare binding done

day 4: monday

on frame done

baste done

day 5, 6: wednesday 

quilt done

 day 7:thursday 

trim done

attach binding  done

day 8: friday

sew binding done

photo done

 blog done

Second quilt experiment has been Boho heart. I had it quilted and ready to bind in 14 days - very pleased. 

1. boho heart - needs binding

2. dotty bow ties - time to assemble

3.  circa 1880-  More about this here. 

4. sea swept - needs quilting and binding

5. twisted braid - unknown what it needs yet.

MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

customer quilt time pause finished

customer quilt time pause finished

1. sea swept

customer quilt time pause

2. wonky courthouse steps 2

customer quilt time pause

3. wonderland table topper

4.wonky courthouse steps

5. tokoyo subway

new 5. scrapbox chevron from 2013

I opened another old 16 quart box of scraps, that I am working on eliminating - such fun. But, I can't let that distract me from what I want to get done with Boho, etc... too much

I am linking:

Wednesday, November 16, 2022

5 quilts 11/16

last report 5 quilts October 31 , 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.

1. rhododendren mystery - Bonnie hunter - the top center is together. And I did get brave enough to trim.


2. Boho heart - I have finished a small section of group 3

3. I am working on the sashings of dotty bow ties.  The bow tie blocks are made. I am slowly adding a sashing to the center of each block, 10 at a time. All of the blocks are made, but, I am short a few. Do I make more or make the quilt smaller .....hmm


4. circa 1880-  More about this here. All the rows are sewn together that I have made.

5. scrappy twirl  - finished - hooray


new number 5 - frolic mystery - back and binding - re-ironed - frame

MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

customer quilt time pause

customer quilt time pause

1. sea swept

customer quilt time pause

2. wonky courthouse steps 2

customer quilt time pause

3. wonderland table topper

4.wonky courthouse steps

5. tokoyo subway

I  am linking to:

Monday, October 31, 2022

5 quilts October 31, 2022

 And just like that- October is over. My goodness, it was fast. I have had a swollen sore thumb and have not felt like sewing for a week. It will be 3 weeks before the hand doctor can see me. That gives me a time line. One or two days before the appointment, it will be miraculously cured. haha

last report 5 quilts October 17 , 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.

1. rhododendren mystery - Bonnie hunter - The center is together and the 2 side pieces are together. It is just a matter of sewing the pieces. no change

2. Boho heart - I am working on section 3


3. dotty bow ties-  The bow tie blocks are made. I am slowly adding a sashing to the center of each block, 10 at a time I have 40 finished. I ran out of sashing pieces and need to cut more before I can continue. These are so fun.


4. circa 1880-  More about this here. I have 8 rows sewn together, which is halfway. I think all the rows have been made. I have 2 more sets of three ready to add to the mother ship.

5. blue ridge beauty - back and binding - ironed - on the frame - quilted - bound- finished


new #5. scrappy twirl -back and binding - I need to re iron the top and add it to the longarm frame. - quilted -trimmed

MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

1. lotus flower? I don't remember this -I have decided not to quilt this one. I added it to my etsy store



1. ugly I spy - I don't want to finish this one. I am donating this one or using it as a back - I will put it in the backing pile and see if I use it.

2. frolic mystery -back and binding - ironed

customer quilt time pause

3. sea swept

4. wonky courthouse steps 2

5. wonderland table topper

I am linking:


Monday, October 17, 2022

5 quilts October 17, 2022

 Someone suggested that I move, a quilt to be quilted, into the 5 quilts, and, I thought it was a brilliant idea, so, I will drop the rainbow scrap challenge as part of 5 quilts.

last report 5 quilts October 5 , 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.

1. rhododendren mystery - Bonnie hunter - The center is together and the 2 side pieces are together. It is just a matter of sewing the pieces.


2. Boho heart - The first part of section 3 is ready to go.


3. I started the assembly of dotty bow ties.  The bow tie blocks are made. I am slowly adding a sashing to the center of each block, 10 at a time


4. circa 1880-  More about this here. I have 8 rows sewn together, which is halfway. I think all the rows have been made. It is time to sew them together and see if I have made enough.

5. blue ridge beautyback and binding - ironed - on the frame

I have been quilting this very large quilt with swirls. I have made some progress and hope to have it quilted this week.


MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

1. lotus flower? I don't remember this -my notes say it is in the upstairs closet - I have decided not to quilt this one. I may just ask at guild if anyone would like this.

customer quilt time pause

2. scrappy twirl

3. ugly I spy

4. frolic mystery

5 sea swept

Wednesday, October 5, 2022

5 quilts October 5, 2022

last report 5 quilts September 23, 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.

1. Rainbow scrap challenge- lime or light green - I haven't started yet.

2. rhododendren mystery - hunter - I sewed the longest row and added it to the next row. I have the other side ready too.


3. Boho heart - ready to start section 3. I have the first row of blocks sorted.

4. I started dotty bow ties last month. The bow tie blocks are all ready. I am slowly adding a sashing to the center of each block, 10 at a time

5. circa 1880-  The last time I worked on this was in 2020. I have 8 rows sewn together, which is halfway.

MY  next on the longarm of my own quilts in the 'to be quilted' closet. Right now I have 48( Oh my) tops ready to quilt of my own.

1. EPP green - need back and binding - ironed - frame - quilted - needs binding - found the binding - finished



2. lotus flower? I don't remember this -my notes say it is in the upstairs closet - I have decided not to quilt this one. I may just ask at guild if anyone would like this.

3. blue ridge beauty - back and binding - ironed - frame

customer quilt time pause

4. scrappy twirl

5. ugly I spy

new5. frolic mystery

I  am linking to:



Friday, September 23, 2022

5 quilts September 23, 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.

5 quilts last report September 14, 2022   

1. Rainbow scrap challenge- light blue - I have all the light blue finished for the month

2. rhododendren mystery - hunter - This is the bottom corner and I have the top corner done as well. I have 1 row of 4 ready to add to the quilt

3. Boho heart -Three more blocks made for section 2




4. I started dotty bow ties. The bow tie  blocks are all ready. I am slowly adding a sashing to each block, 10 at a time




5. circa 1880-  The last time I worked on this was in 2020. I have 8 rows sewn together, which is halfway.



MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

1. EPP green - need back and binding - ironed - frame - quilted - needs binding - found the binding

customer quilt time pause - linda

2. lotus flower? I don't remember this -my notes say it is in the upstairs closet - I have decided not to quilt this one. I may just ask at guild if anyone would like this.

customer quilt time pause

3. blue ridge beauty - 

4. scrappy twirl

5. ugly I spy

I am linking to:


Wednesday, September 14, 2022

5 quilts 9/14

5 quilts last report August 22, 2022   

1. Rainbow scrap challenge- light blue - I have been adding a few zipper blocks as I go along  with the rainbow scrap challenge at so scrappy.


2. rhododendren mystery - hunter - I finished a row with a set of 4 - 3 rows to go


3. Boho heart -Two more blocks made for section 2





4. I started dotty bow ties. The blocks are all ready. I cut what I need for the idea of sashing I am planning. I may need to cut more if my math is wrong.



5. circa 1880- I needed more triangles for the blocks and decided to add kona snow for the alternate color. I had a 6 yard piece and surely that will be enough to finish this top.  The last time I worked on this was in 2020.




MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

1. EPP green - need back and binding - ironed - frame - quilted - needs binding - found the binding

customer quilt time pause - linda

2. lotus flower? I don't remember this -my notes say it is in the upstairs closet - I have decided not to quilt this one. I may just ask at guild if anyone would like this.

customer quilt time pause

3. blue ridge beauty - 

4. scrappy twirl

5. ugly I spy

I  am linking to:


Monday, September 5, 2022

5 quilts: September 4, 2022

 5 quilts last report August 22, 2022

1. Rainbow scrap challenge- light blue

I needed one more candy block to have all the blocks done for this years project. All the colors are done. I decided on a chocolate candy. I am just going to sew them in rows for a fun charity quilt.


2. rhododendren mystery - hunter - I am working on a row with a set of 4

3. Boho heart -I have the next line of 3 blocks made for section 2


4. maple leaves - this one is ready for the "to be quilted" closet. 

It is time for a new project to take it's place. When the new quiltville leader/ ender challenge was announced, I decided to work on my previous starts of leader/ender challenges instead ( so far). I could go back to the very first one and find it as an UFO. Bonnie did cheddar bow ties,  I started dotty bow ties. I didn't need many to make my goal, so, the blocks are all ready. I just need to decide on a layout and start assembly. 


5. fair and square - the top is finished. I just need a back and binding before sending it to the pile of unquilted tops.

New 5. I have decided on a UFO that was part of a swap with quilty friends. circa 1880 I have a few rows already done and I realize that I don't have enough of the original backing that I bought for the quilt, so, I had to work that out in my head. I think I can begin again. The last time I worked on this was in 2020.


MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

1. EPP green - need back and binding - ironed - frame - quilted - needs binding

customer quilt time pause - linda

2. lotus flower? I don't remember this -my notes say it is in the upstairs closet - I have decided not to quilt this one. I may just ask at guild if anyone would like this.

customer quilt time pause

3. blue ridge beauty - 

4. scrappy twirl

5. ugly I spy

I am linking: