Showing posts with label dotty bow ties. Show all posts
Showing posts with label dotty bow ties. Show all posts

Monday, January 23, 2023

5 quilts january 23, 2023

 last report 5 quilts January 6, 2023

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another. I decided that for 2023, rather than work a little on each one at a time, I would concentrate on just one. I still use the list to plan and look ahead. My focus will be circa 1880 until it is a complete finish. It will probably be my one monthly goal for February. The new UFOs added to the list have more piecing and assembling to do. That will give me time on the longarm for quilts that are ready for quilting.

1. dotty bow ties finished


2. circa 1880-  More about this here.  I have the ends finished and I am looking for the perfect border from my stash. I don't want to add much border or it won't fit on the long arm LOL. I think it needs something.


3. sea swept finished - no photos yet.


4. twisted braid - All the pieces were cut when I opened the box. I started sewing blocks at my Friday sewing group meeting. I got just so far, and there was a mistake on the cutting. I need to add more strips. It will be my portable project for group sews.


5. radiant star from 2012 -My notes say it is a finished top but not in the to be quilted closet. So it must need a back and binding AND OF COURSE QUILTING.


MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

1. wonderland table topper

customer pause

1. circa 1880

customer pause

2. wonky courthouse steps 2

customer pause

3. tokoyo subway

4. scrapbox chevron from 2013

5. wonky wishes 2017

checkered past

ubi

I am linking:



Sunday, January 22, 2023

stash report January 22, 2023

  I bought a few mystery solid fat quarters. I like all the colors, but, I don't use solids much. I wonder why.

Stash report January 8, 2023

fabric added: 1 1/2 yards
fabric added year to date: 13 1/2 yards 

fabric used: 12 yards     dotty bow ties finished



fabric used year to date: 12 yards  

1 1/2 yards bought more than used

I sewed 6 days last week.  including Friday sew

I made a winter wreath for Mr Snowman rug hooking project. 


Today we will be traveling to see our son's family. I hope to work on a hexie or two for my longtime hexie project.

I am linking to:

15 min to stitch at life in pieces

Friday, January 20, 2023

dotty bow ties finish

 Dotty bow ties is done. My first finish for the year is the first quiltville leader/ ender challenge from 2011 - 2012. This year, when the new leader/ender was announced, I decided, rather than start a new project/quilt, I would go back, and actually finish the ones I have already started. I have started each new challenge over the years, but have finished two.

72 x 72

12 yards of fabric 

I used as leftover dotty fabric for the binding 

I used 2 larger pieces of pink for the back. I free motioned circles on the longarm.

If I continue finishing the leader/ ender UFOs, spools would be next from 2012- 2013. I know I have many many spools made and ready. If I remember right, I may have swapped with others on that block. I would have to wait for an opening on the 5 quilt list.

I am linking to:

TGIFF

TGIFF different     here  and here

please consider signing up to host the weekly party here 

Friday, January 6, 2023

5 quilts progress report January 2023

 last report 5 quilts December 12 , 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another. I decided that for 2023, rather than work a little on each one at a time, I would concentrate on just one. I still use the list to plan and look ahead. My focus will be dotty bow ties until it is a complete finish. Sea swept is my one monthly goal for January. SO, hopefully, I will have 2 finishes this month.

1. Boho heart - finished


2. dotty bow ties-  is a top. I am ready to make a backing and prepare the binding. Then, it is ready to be quilted


3. circa 1880-  More about this here.  It is time to lay it out again and see what I need to do to the edges


4. sea swept - needs quilting and binding omg january 2023


5. twisted braid - unknown what it needs yet. It will be my portable project for group sews.

new number 5. radiant star from 2012

MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

customer pause

1. wonderland table topper

2. wonky courthouse steps 2

customer pause

3. tokoyo subway

4. scrapbox chevron from 2013

5. wonky wishes 2017


I am linking to:

Friday, December 30, 2022

dotty bow ties almost top

 I only have 2 more rows of dotty bow ties to add to the quilt. I am almost there. hooray


It is time to prepare for next year's phd progress projects. I had to chuckle when quilting Gail said if you have at least 12 UFOs, make a list. It guarantees my participation for many more years. How many? I fear, longer than I will live at this point. Is any one honest about the number of UFOs? I tell my friends one number, and my lists say another, and then, there is the husband number.... oh well, just keep sewing.

I had a fun year last year focusing on the UFO finishes. I hope to do that again in 2023

I am linking to:

PHD

Monday, December 26, 2022

dotty progress

I did a little Christmas sewing, and, I have three rows together of dotty bow ties. I have a few more sashings made for adding more rows.


It was a cold, quiet holiday. I had most of the food bought early, so that was not a problem. We spent the- too cold to do anything (-10) - time watching Christmas movies. It was fun. We didn't get to see our family. bummer. It was too dangerous for this old couple to be out and about. We are now at a balmy16 degrees with a slight dusting of snow and a few drifts from the wind which was relentless. 

Monday, December 19, 2022

bow ties progress

Dotty bow ties has been sewn into foursies. There are 8 in each row, so I am getting closer. I plan on adding sashings between rows.


My quilter friend Linda made this great  scrap quilt during our Friday sew. It uses 2 1/2 inch squares. She says it is a pattern in the scrap school quilt book. If there really was such a quilt as a scrap buster, this would be a good candidate.


Hope everyone is busy with Christmas plans and happy times.

I am linking:

Saturday, December 17, 2022

bow ties

I have been working on an old ufo, leader and ender challenge. It has every color in it. I started making little bow tie blocks for the 2012 quiltville leader/ender challenge. It has been on vacation a long time. All the blocks of 4 have been made, and I sashed each one on the side.


This week, I made twosies.

Monday, December 12, 2022

5 quilts December 12, 2022

 last report 5 quilts November 16 , 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.

1. rhododendren mystery - Bonnie hunter - 

finished 12/22

2. Boho heart - it is quilted waiting on binding

3. dotty bow ties-  all the blocks are done and first sashing on them

4. circa 1880-  More about this here.  no progress

5 - frolic mystery - back and binding - re-ironed - frame  finished  11/22

Making a 5 quilts report has been good for staying on track and finishing, but, I am bored with how long it takes to finish, and, I can't find stuff and keep it straight anymore.  I have a few concerns.

maybe one at a time would be better? but would I get any others done?

I decided to keep the list, but, work on one at a time.

Rhododendron was my first experiment. I finished it in 8 days including quilting. That was great and helped with motivation. And as long as I had a list item per day. I wasn't bored. 

take Rhododendron  16 steps -I finished Rhododendron in 8 days which is impressive for me sticking to the plan

day 1: friday

cut inner border done

sew inner border done

day 2: saturday

make odd border pieces done

piece border done

day 3:sunday

attach border done

iron done

back done

prepare binding done

day 4: monday

on frame done

baste done

day 5, 6: wednesday 

quilt done

 day 7:thursday 

trim done

attach binding  done

day 8: friday

sew binding done

photo done

 blog done

Second quilt experiment has been Boho heart. I had it quilted and ready to bind in 14 days - very pleased. 

1. boho heart - needs binding

2. dotty bow ties - time to assemble

3.  circa 1880-  More about this here. 

4. sea swept - needs quilting and binding

5. twisted braid - unknown what it needs yet.

MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

customer quilt time pause finished

customer quilt time pause finished

1. sea swept

customer quilt time pause

2. wonky courthouse steps 2

customer quilt time pause

3. wonderland table topper

4.wonky courthouse steps

5. tokoyo subway

new 5. scrapbox chevron from 2013

I opened another old 16 quart box of scraps, that I am working on eliminating - such fun. But, I can't let that distract me from what I want to get done with Boho, etc... too much

I am linking:

Wednesday, November 16, 2022

5 quilts 11/16

last report 5 quilts October 31 , 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.

1. rhododendren mystery - Bonnie hunter - the top center is together. And I did get brave enough to trim.


2. Boho heart - I have finished a small section of group 3

3. I am working on the sashings of dotty bow ties.  The bow tie blocks are made. I am slowly adding a sashing to the center of each block, 10 at a time. All of the blocks are made, but, I am short a few. Do I make more or make the quilt smaller .....hmm


4. circa 1880-  More about this here. All the rows are sewn together that I have made.

5. scrappy twirl  - finished - hooray


new number 5 - frolic mystery - back and binding - re-ironed - frame

MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

customer quilt time pause

customer quilt time pause

1. sea swept

customer quilt time pause

2. wonky courthouse steps 2

customer quilt time pause

3. wonderland table topper

4.wonky courthouse steps

5. tokoyo subway

I  am linking to:

Monday, October 31, 2022

5 quilts October 31, 2022

 And just like that- October is over. My goodness, it was fast. I have had a swollen sore thumb and have not felt like sewing for a week. It will be 3 weeks before the hand doctor can see me. That gives me a time line. One or two days before the appointment, it will be miraculously cured. haha

last report 5 quilts October 17 , 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.

1. rhododendren mystery - Bonnie hunter - The center is together and the 2 side pieces are together. It is just a matter of sewing the pieces. no change

2. Boho heart - I am working on section 3


3. dotty bow ties-  The bow tie blocks are made. I am slowly adding a sashing to the center of each block, 10 at a time I have 40 finished. I ran out of sashing pieces and need to cut more before I can continue. These are so fun.


4. circa 1880-  More about this here. I have 8 rows sewn together, which is halfway. I think all the rows have been made. I have 2 more sets of three ready to add to the mother ship.

5. blue ridge beauty - back and binding - ironed - on the frame - quilted - bound- finished


new #5. scrappy twirl -back and binding - I need to re iron the top and add it to the longarm frame. - quilted -trimmed

MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

1. lotus flower? I don't remember this -I have decided not to quilt this one. I added it to my etsy store



1. ugly I spy - I don't want to finish this one. I am donating this one or using it as a back - I will put it in the backing pile and see if I use it.

2. frolic mystery -back and binding - ironed

customer quilt time pause

3. sea swept

4. wonky courthouse steps 2

5. wonderland table topper

I am linking:


Saturday, October 22, 2022

green zipper

I am adding some green to my zipper blocks for the rainbow scrap challenge at so scrappy. I cut a few and then when I started piecing, I decided to match the centers with all the previous cut zippers. I had a fun morning sewing them into strips and sub cutting the twosies for the centers. This year, I have about 60 cut, and, I think I want to cut some more next year during the rsc challenge.

and a few dotty bow ties


Best news is that I finally had a finish this month - Blue ridge beauty

Monday, October 17, 2022

5 quilts October 17, 2022

 Someone suggested that I move, a quilt to be quilted, into the 5 quilts, and, I thought it was a brilliant idea, so, I will drop the rainbow scrap challenge as part of 5 quilts.

last report 5 quilts October 5 , 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.

1. rhododendren mystery - Bonnie hunter - The center is together and the 2 side pieces are together. It is just a matter of sewing the pieces.


2. Boho heart - The first part of section 3 is ready to go.


3. I started the assembly of dotty bow ties.  The bow tie blocks are made. I am slowly adding a sashing to the center of each block, 10 at a time


4. circa 1880-  More about this here. I have 8 rows sewn together, which is halfway. I think all the rows have been made. It is time to sew them together and see if I have made enough.

5. blue ridge beautyback and binding - ironed - on the frame

I have been quilting this very large quilt with swirls. I have made some progress and hope to have it quilted this week.


MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

1. lotus flower? I don't remember this -my notes say it is in the upstairs closet - I have decided not to quilt this one. I may just ask at guild if anyone would like this.

customer quilt time pause

2. scrappy twirl

3. ugly I spy

4. frolic mystery

5 sea swept

Monday, October 10, 2022

dotty

I'm seeing dots. These are almost addictive...if there weren't so many. I like the secondary pattern, but, still think I will add another sashing when I join blocks. I make a few of these almost every morning. This was my choice for Bonnie Hunter's first leader/ender challenge. All I did was make the little bow tie blocks. Now, it is time to make a quilt top.


bow tie blocks are 3 1/2 inches

so fun

I really liked the yummy scrappiness of this quilt from the quilt show this weekend. I forgot to take pictures of the cards. sigh....

Indy quilt show


I am linking:




Wednesday, October 5, 2022

5 quilts October 5, 2022

last report 5 quilts September 23, 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.

1. Rainbow scrap challenge- lime or light green - I haven't started yet.

2. rhododendren mystery - hunter - I sewed the longest row and added it to the next row. I have the other side ready too.


3. Boho heart - ready to start section 3. I have the first row of blocks sorted.

4. I started dotty bow ties last month. The bow tie blocks are all ready. I am slowly adding a sashing to the center of each block, 10 at a time

5. circa 1880-  The last time I worked on this was in 2020. I have 8 rows sewn together, which is halfway.

MY  next on the longarm of my own quilts in the 'to be quilted' closet. Right now I have 48( Oh my) tops ready to quilt of my own.

1. EPP green - need back and binding - ironed - frame - quilted - needs binding - found the binding - finished



2. lotus flower? I don't remember this -my notes say it is in the upstairs closet - I have decided not to quilt this one. I may just ask at guild if anyone would like this.

3. blue ridge beauty - back and binding - ironed - frame

customer quilt time pause

4. scrappy twirl

5. ugly I spy

new5. frolic mystery

I  am linking to:



Friday, September 23, 2022

5 quilts September 23, 2022

I try to work on these 5 quilts until they are done. Their turn in the UFO closet is over, and, they need to be finished one way or another.

5 quilts last report September 14, 2022   

1. Rainbow scrap challenge- light blue - I have all the light blue finished for the month

2. rhododendren mystery - hunter - This is the bottom corner and I have the top corner done as well. I have 1 row of 4 ready to add to the quilt

3. Boho heart -Three more blocks made for section 2




4. I started dotty bow ties. The bow tie  blocks are all ready. I am slowly adding a sashing to each block, 10 at a time




5. circa 1880-  The last time I worked on this was in 2020. I have 8 rows sewn together, which is halfway.



MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

1. EPP green - need back and binding - ironed - frame - quilted - needs binding - found the binding

customer quilt time pause - linda

2. lotus flower? I don't remember this -my notes say it is in the upstairs closet - I have decided not to quilt this one. I may just ask at guild if anyone would like this.

customer quilt time pause

3. blue ridge beauty - 

4. scrappy twirl

5. ugly I spy

I am linking to:


Monday, September 19, 2022

circa rows

I had a wonderful sew day with my quilt guild. We met at the library and had a pitch in lunch - yummy

I worked on three projects. I have started making blocks for dotty bow ties ( I need 80), And, I added the third row to rhododendron mystery quilt. Then, I could settle in, and sew triangles to squares until I was too tired to go any further.




I made 2 more rows  and sewed them to the top. I didn't get a picture after I sewed them together circa 1880 was a swap I participated in with my quilty friends.

Wednesday, September 14, 2022

5 quilts 9/14

5 quilts last report August 22, 2022   

1. Rainbow scrap challenge- light blue - I have been adding a few zipper blocks as I go along  with the rainbow scrap challenge at so scrappy.


2. rhododendren mystery - hunter - I finished a row with a set of 4 - 3 rows to go


3. Boho heart -Two more blocks made for section 2





4. I started dotty bow ties. The blocks are all ready. I cut what I need for the idea of sashing I am planning. I may need to cut more if my math is wrong.



5. circa 1880- I needed more triangles for the blocks and decided to add kona snow for the alternate color. I had a 6 yard piece and surely that will be enough to finish this top.  The last time I worked on this was in 2020.




MY  next on the longarm of my own quilts in the 'to be quilted' closet. 

1. EPP green - need back and binding - ironed - frame - quilted - needs binding - found the binding

customer quilt time pause - linda

2. lotus flower? I don't remember this -my notes say it is in the upstairs closet - I have decided not to quilt this one. I may just ask at guild if anyone would like this.

customer quilt time pause

3. blue ridge beauty - 

4. scrappy twirl

5. ugly I spy

I  am linking to: