Showing posts with label allietare. Show all posts
Showing posts with label allietare. Show all posts

Tuesday, July 30, 2019

En Provence finish

Despite throwing back surgery into the month of July, I did finish my goals for the month. August will be a different story, I am sure. Unless, watching tv can be a goal.
I finished En Provence mystery quilt to the point of hand sewing the binding before surgery, and I have slowly worked on that while in the recliner. En Provence was 2016 mystery quilt from Bonnie Hunter at Quiltville. I have on Ringo lake and good fortune to finish yet. I had already finished en provence in the quiltville colors. I did two of them, this one using civil war reproduction fabrics. Don't forget to check the mystery quilt page at the top of the blog to see all I have finished in the mystery challenge.



The sun was too bright to get the colors right. This is a better photo of  the colors.


I finished Allietare earlier in the month.


and, I am current with the rainbow projects for July. Our swap group has been very diligent in meeting our commitments each month, and I love the blocks I am receiving.


I sneak upstairs every day for a bit sewing machine time. I don't get much sewn, because, I am  still tired, but I like the distraction.
This is also part of the 2019 finish along.
My list for the 3rd quarter:
1.wiggle time finished
2. allietare finished
4. sweet land of liberty
5. unicorn
6. good fortune finished
7. crazy 6
8. countryside cottage
9. sugar mountain finished
10.En provence finished
11. melba applique
12.on ringo lake finished
13. scrappy twirl
14. soul searching

I am linking to:


chameleon color linky


I am linking to:

Sunday, July 21, 2019

allietare 2015


I am scheduling this post ahead, and hoping I am recovering well from surgery. I am really excited to have finished this quilt.This is the 2015 quiltville mystery quilt allietare. I had the top together before it was set aside. I did add borders. This is Bonnie Hunter's 14th mystery and my 15th finished. I have 3 more to go to have all the mystery quilts done. I really hope that I have them done before the next mystery is released in November.



I really like the colors.




This is part of my finish a long goals and my one monthly goal for July

My list for the 3rd quarter:
1.wiggle time finished
2. allietare finished
4. sweet land of liberty
5. unicorn
6. good fortune finished
7. crazy 6
8. countryside cottage
9. sugar mountain finished
10.En provence finished
11. melba applique
12.on ringo lake finished
13. scrappy twirl
14. soul searching

I am linking to:

Thursday, July 11, 2019

finish along goals

I finished 4 quilts for the 2019 finish along in the second quarter. I have plenty of goals leftover for the third quarter.  I will be having back surgery in the next week, so I don't know how much that will effect my sewing and blogging or for how long.
I am working on the binding for allietare, and, I have sugar mountain ready to put on the long arm.


I have a few more garden party blocks, and


another batch of 50 -4 patches for sand castles.


My list for the 3rd quarter:
1.wiggle time
2. allietare
4. sweet land of liberty
5. unicorn
6. good fortune
7. crazy 6
8. countryside cottage
9. sugar mountain
10. jelly mystery
11. melba applique
12.on ringo lake
13. scrappy twirl
14. soul searching


I am linking to:

Monday, July 1, 2019

fabric storage

I am very excited about a big change in my fabric storage. My Hubby, son and Grandson turned this


into this




Oh, what fun it will be to fill those shelves. I used Ikea billy bookcases, and I splurged on the glass doors. What I have been using, is a hodge podge of goodwill bookcases. I have lost a lot of room with shorter bookcases. I liked these because they almost go to the ceiling. They are really lovely to behold. I almost don't want to mess them up with fabric.

It's the first of July already and time to reassess my goals for the month.
1. I want to finish allietare. It is on the long arm and ready to quilt.


2. I want to finish en provence in reproduction fabrics. It is a top and ready to make a back and quilt.



3. I want to make my swap blocks
4. I want to keep current on my rainbow scrap challenge projects.



I am linking to:


Friday, June 28, 2019

allietare and one monthly goal

Earlier this month, I posted my goals for one monthly goal at Elm street quilts.
My one monthly goal for June
I wanted to:
1. Finish smith mountain morning - done


2. move allietare along- done
I cut and trimmed the outside of allietare, and I added the gold inner border. I like pressing the borders and noticing all the bits of fabric that I used. The red with black crows was/is one of my favorite Debbie Mumm prints.


I added a black outer border, and it is on the long arm ready to quilt.



3. make swap blocks - done
4. keep up with rainbow scrap challenge -done
5. and I wanted to start garden party piecing. - done I have 40 blocks made and thanks to Lisa B for the help to get this block fixed.



I am linking to:

I was featured last week at



Saturday, May 4, 2019

May one monthly goal

My May one monthly goal is a the same as the April goal only taking the next steps. I have made it more challenging by upending my sewing room for a remodel. I am not sure why I picked this exact time to try something new, but, it is a big mess right now as we put everything to rights. I had no idea how many little containers of little scrap pieces I kept shoving to the back and ignoring.  The big change is turning the corner with an ikea table. I am going to really like the space to the left of the sewing machine for borders and big quilts and bindings. The corner piece was bigger than I expected, so everything had to move around for it to fit.


The sewing machine has been silent but I have used the treadle to make this string block, even though, I had decided no more strings for awhile, and had cleaned up the area. But, all those little baskets of little pieces I found had to go somewhere.


The ironing board is at best all covered with undecided stuff from the sewing area, and I haven't really had a place to press anything yet. I did find the crayon for the rainbow scrap challenge accessible, and, I could sew the strip together for orange for the color for May.


I am making progress and hopefully, I will back to a regular quilting routine.

For May I want to assemble allietare, quilt and bind smith mountain morning, swap our circa 1880 blocks, and keep current with the rainbow scrap challenge. oh and hook up my sewing machine.

I am linking:

lots of orange inspiration at:




I am linking to:




Whoop Whoop

Monday, April 1, 2019

april one monthly goal

I am glad for a new month to see what quilting goals I can accomplish. I appreciate the one monthly goal party for helping to set goals and keep a focus for the month.

In April, I want to finish the quiltville mystery quilt Allietare. The main part of the top is finished, I need to add borders and quilt it. I stopped when it was time to trim the top. That was a scary step. I feel braver now.


I am ready for the next batch of circa 1880 swap. I need 30 blocks. I have been finding bits and pieces of reproduction fabric as I clean and tidy, so I will use those pieces first.


And I want to assemble the top for my Smith mountain morning quilt. I took a class with Bonnie Hunter in fall of 2014. I had 2 friends with me, and I think I will challenge them to at least look at it this month.


And I want to keep current with my rainbow scrap challenge quilts.

I am linking to:


Tuesday, December 18, 2018

ufo 2019 edition

Patchwork times has an ufo challenge for 2019. I have enjoyed using some sort of ufo motivation for my quilting these last couple of years. She suggested 12 of them. I am sure my One monthly goals will also use help finish these projects along.

A couple of years ago, my daughter and 3 other quilty friends exchanged houses every month. It had to be before I was blogging since I can't find any reference to them here on the blog.They were to finish at 4 inches but could be anything and any fabric. It will be fun to get them out and look at them.


2015 Allietare! - needs borders and so on
2013 celtic solstice just needs quilted


on ringo lake is in blocks and I have a corner pieced. Just 2 weeks ago, I moved my sewing cabinet and discovered sashing pieces behind it. I would have been beside myself, if I had not found these before working on it again. Even now, I worry that I will forget to get them back to the project box.


I did a second version of Grand illusion using Denise Schmidt  fabrics. I have it assembled minus the borders.


2016 En Provence civil war - needs quilted
lucy's basket  was another swap project with my daughter.


cactus patch
garden party
smith mountain morning was  a workshop with Bonnie Hunter in Lafayette Indiana. I have all the blocks finished.



I am adding two new quilts to the list
black sheep
sand castles

I am linking to:

too cute tuesday

chameleon color linky

Oh scrap
Patchwork times